Cloud

    Cloud Migration Services

    Migrations fail in predictable ways: a copy that missed the database, DNS that took a day to propagate, a certificate nobody re-issued, and a rollback plan that existed only in somebody's head.

    Start with the audit

    No sales layer, no juniors. You meet the engineer before anything begins.

    // What is included

    What you get

    • Everything copied and verified on the destination before anything switches
    • DNS moved with a low TTL, so a mistake costs minutes and not days
    • The rollback step written down before the work starts
    • The source environment left intact until you have confirmed the new one

    // How it runs

    The sequence

    1. 01

      Inventory

      What moves, what it depends on, and what must not go down.

    2. 02

      Replicate

      Stand up and verify the destination while the old one still serves.

    3. 03

      Cut over

      Staged switch, verified at each step, with a way back at every stage.

    // Stack

    • AWS
    • GCP
    • Azure
    • Terraform
    • Amazon ElastiCache
    • Amazon RDS

    // Related work

    Where this has been done before

    Client names under NDA. The numbers are not.

    Zero-downtime Redis to ElastiCache migration (martech SaaS, NDA)

    • Replication-based sync kept both caches current
    • Circuit breaker in the application path to fail safe
    • Traffic cut over in stages, verified at each step

    0 minutes of user-facing downtime

    Self-hosted infrastructure retired onto managed services (NDA)

    • Self-managed Kubernetes to ECS and Fargate
    • Configuration store to Parameter Store and Secrets Manager
    • Artifact repository to ECR and CodeArtifact

    Four self-maintained components retired

    All case studies

    // Questions

    Before you ask

    Talk to the engineer who would do the work

    A 20 minute call. You describe your setup, you get an honest read on whether this helps, and the top risks worth looking at first.

    See pricing